SR 9 @ 6 INTERSECTIONS AND SR 20 @ TRIBBLE RD
Sector: Road • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The purpose of this project is to improve the operating characteristics of 7 separate intersections in Forsyth County; 6 on SR 9 and 1 on SR 20. The intersections are with County roads at high volume/poor existing condition locations that Forsyth County and the DOT identified for upgrading. They include: A.C. Smith Road, Spot Road, Castleberry Road, Post/ Mullinax Road, Majors/ Shiloh Road, Hamby
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The purpose of this project is to improve the operating characteristics of 7 separate intersections in Forsyth County; 6 on SR 9 and 1 on SR 20. The intersections are with County roads at high volume/poor existing condition locations that Forsyth County and the DOT identified for upgrading. They include: A.C. Smith Road, Spot Road, Castleberry Road, Post/ Mullinax Road, Majors/ Shiloh Road, Hamby Road, and Post/Tribble Road. The existing roads vary in number of lanes at the intersection, but most have one 12-foot through lane in each direction and either right or left turn lanes. All of them have shoulders and swale drainage; some have small sections of curb and gutter. The project proposes to modify the alignment of either the state route or the county road at some of the locations, upgrade the pavement widths and structure, add left and/or turn lanes at all of the intersections, install new signals at 3 of the locations and upgrade the signal at 3 of the others. The signalized inters |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
