SR 9 @ 6 INTERSECTIONS AND SR 20 @ TRIBBLE RD
Sector: Road • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The purpose of this project is to improve the operating characteristics of 7 separate intersections in Forsyth County; 6 on SR 9 and 1 on SR 20. The intersections are with County roads at high volume/poor existing condition locations that Forsyth County and the DOT identified for upgrading. They include: A.C. Smith Road, Spot Road, Castleberry Road, Post/ Mullinax Road, Majors/ Shiloh Road, Hamby
- Status
- Closed
- Sector
- Road, Waste Processing and Treatment, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 9 @ 6 INTERSECTIONS AND SR 20 @ TRIBBLE RD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of this project is to improve the operating characteristics of 7 separate intersections in Forsyth County; 6 on SR 9 and 1 on SR 20. The intersections are with County roads at high volume/poor existing condition locations that Forsyth County and the DOT identified for upgrading. They include: A.C. Smith Road, Spot Road, Castleberry Road, Post/ Mullinax Road, Majors/ Shiloh Road, Hamby Road, and Post/Tribble Road. The existing roads vary in number of lanes at the intersection, but most have one 12-foot through lane in each direction and either right or left turn lanes. All of them have shoulders and swale drainage; some have small sections of curb and gutter. The project proposes to modify the alignment of either the state route or the county road at some of the locations, upgrade the pavement widths and structure, add left and/or turn lanes at all of the intersections, install new signals at 3 of the locations and upgrade the signal at 3 of the others. The signalized inters |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Waste Processing and Treatment, Government |
Article published date | 2026-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
