logo

SR-91 Eastbound Lane Addition Project (SR-241 to SR-71)

Sector: Bridge • Location: California, United States of America (USA)

Source: Orange County Transportation Authority

Project
Closed

The Riverside Freeway (SR-91) Eastbound Lane Addition Project was the first in a series of projects intended to increase capacity, relieve congestion and improve mobility on SR-91. The Orange County Transportation Authority (OCTA), in cooperation with the California Department of Transportation (Caltrans) and the Riverside County Transportation Commission (RCTC), added a lane to the eastbound Rive

Project Information FAQ

Project Information

4 Q
The project “SR-91 Eastbound Lane Addition Project (SR-241 to SR-71)” is an infrastructure initiative in the Bridge sector, located in California, United States of America (USA). Taiyo aggregates data on it from Orange County Transportation Authority.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Riverside Freeway (SR-91) Eastbound Lane Addition Project was the first in a series of projects intended to increase capacity, relieve congestion and improve mobility on SR-91. The Orange County Transportation Authority (OCTA), in cooperation with the California Department of Transportation (Caltrans) and the Riverside County Transportation Commission (RCTC), added a lane to the eastbound Riverside Freeway (SR-91) between the Eastern Toll Road (SR-241) in eastern Orange County and the Corona Expressway (SR-71) in western Riverside County. This project length is approximately 6 miles. The project widened all lanes and shoulders in the project area to full standard widths, widened five bridges, and helped relieve bottlenecks at the merger of northbound SR-241/SR-91 and at the interchange of SR-91/SR-71. It improved the general flow of eastbound traffic on SR-91 in the project area.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data