logo

SR-91 (SR-57 to SR-55) Improvement Project

Sector: Car parking • Location: California, United States of America (USA)

Source: Orange County Transportation Authority

Project
Under Construction

The Orange County Transportation Authority (OCTA), in partnership with the California Department of Transportation (Caltrans), is improving State Route 91 from State Route 57 to State Route 55. The project, which is in the design phase, will improve mobility throughout the corridor, reduce weaving and merging between ramps, and improve on- and off-ramps, sidewalks and bike lanes at the Glassell St

Project Information FAQ

Project Information

4 Q
The project “SR-91 (SR-57 to SR-55) Improvement Project” is an infrastructure initiative in the Car parking sector, located in California, United States of America (USA). Taiyo aggregates data on it from Orange County Transportation Authority.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Orange County Transportation Authority (OCTA), in partnership with the California Department of Transportation (Caltrans), is improving State Route 91 from State Route 57 to State Route 55. The project, which is in the design phase, will improve mobility throughout the corridor, reduce weaving and merging between ramps, and improve on- and off-ramps, sidewalks and bike lanes at the Glassell Street, Tustin Avenue and Lakeview Avenue interchanges. OCTA and Caltrans are working with the neighboring cities of Anaheim, Orange, Placentia and Fullerton. Segment 1, SR-91/Lakeview Avenue Interchange Anticipated Construction Schedule: Early 2024 to 2027 Segment Improvements Reconstruct Lakeview Avenue overcrossing to include standard lanes, shoulders and sidewalks in each direction Realign westbound State Route 91 (SR-91) on-ramp at Lakeview interchange Add new on-ramp from Lakeview connecting directly to SR-55 Separate westbound SR-91 and southbound SR-55 traffic Segment 2, Between SR-55 and SR-57 Anticipated Construction Schedule: Mid-2025 to Late 2028 Segment Improvements Add new eastbound general purpose lane Reconstruct Kramer Boulevard and Tustin Avenue overcrossings to include standard lanes, shoulders and sidewalks in each direction Segment 3, SR-91/SR-57 Interchange Anticipated Construction Schedule: Mid-2025 to Late 2028 Segment Improvements Improve westbound SR-91 to northbound and southbound SR-57 connectors Add an auxiliary lane from SR-57 to Raymond Avenue/East Street off-ramp Reconstruct La Palma Avenue overcrossing to include standard lanes, shoulders and sidewalks in each direction Add bypass ramp for northbound SR-57 Orangethorpe Avenue off-ramp prior to SR-91, eliminating the need to merge across multiple lanes at the interchange

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data