SR-91 (SR-57 to SR-55) Improvement Project
Sector: Car parking • Location: California, United States of America (USA)
Source: Orange County Transportation Authority
The Orange County Transportation Authority (OCTA), in partnership with the California Department of Transportation (Caltrans), is improving State Route 91 from State Route 57 to State Route 55. The project, which is in the design phase, will improve mobility throughout the corridor, reduce weaving and merging between ramps, and improve on- and off-ramps, sidewalks and bike lanes at the Glassell St
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Orange County Transportation Authority (OCTA), in partnership with the California Department of Transportation (Caltrans), is improving State Route 91 from State Route 57 to State Route 55. The project, which is in the design phase, will improve mobility throughout the corridor, reduce weaving and merging between ramps, and improve on- and off-ramps, sidewalks and bike lanes at the Glassell Street, Tustin Avenue and Lakeview Avenue interchanges. OCTA and Caltrans are working with the neighboring cities of Anaheim, Orange, Placentia and Fullerton. Segment 1, SR-91/Lakeview Avenue Interchange Anticipated Construction Schedule: Early 2024 to 2027 Segment Improvements Reconstruct Lakeview Avenue overcrossing to include standard lanes, shoulders and sidewalks in each direction Realign westbound State Route 91 (SR-91) on-ramp at Lakeview interchange Add new on-ramp from Lakeview connecting directly to SR-55 Separate westbound SR-91 and southbound SR-55 traffic Segment 2, Between SR-55 and SR-57 Anticipated Construction Schedule: Mid-2025 to Late 2028 Segment Improvements Add new eastbound general purpose lane Reconstruct Kramer Boulevard and Tustin Avenue overcrossings to include standard lanes, shoulders and sidewalks in each direction Segment 3, SR-91/SR-57 Interchange Anticipated Construction Schedule: Mid-2025 to Late 2028 Segment Improvements Improve westbound SR-91 to northbound and southbound SR-57 connectors Add an auxiliary lane from SR-57 to Raymond Avenue/East Street off-ramp Reconstruct La Palma Avenue overcrossing to include standard lanes, shoulders and sidewalks in each direction Add bypass ramp for northbound SR-57 Orangethorpe Avenue off-ramp prior to SR-91, eliminating the need to merge across multiple lanes at the interchange |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Car parking projects in United States of America (USA)
- FM 1960 Access Management Study from East Gatewick to BF 1960A
- SH 249 Harris County - BW 8 to I-45 North
- FM 2818 (Harvey Mitchell Parkway) widening
- US 82 (West of Clarksville), US 82 (East of Clarksville) and US 82 Clarksville Loop Projects
- US 59 - El Campo
- SH 36 from FM 2218 to FM 1495 - Brazoria County
- SH 6 Reconstruction - Gorman
- Memorial Drive from BW 8 to Tallowood Road
