SR-91 Westbound, SR-55 to Tustin Interchange
Sector: Bridge • Location: California, United States of America (USA)
Source: Orange County Transportation Authority
This project was completed in 2016. OCTA and Caltrans District 12 relieved congestion and improved operational efficiency on the 91 freeway in the northeastern part of Anaheim. The project extended a westbound lane from the northbound (NB) SR-55/westbound (WB) SR-91 connector through the Tustin Avenue interchange. In addition, a westbound auxiliary lane from east of the NB SR-55/WB SR-91 connector
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project was completed in 2016. OCTA and Caltrans District 12 relieved congestion and improved operational efficiency on the 91 freeway in the northeastern part of Anaheim. The project extended a westbound lane from the northbound (NB) SR-55/westbound (WB) SR-91 connector through the Tustin Avenue interchange. In addition, a westbound auxiliary lane from east of the NB SR-55/WB SR-91 connector to the Tustin Avenue off-ramp was reconstructed. The project added an additional Tustin Avenue exit bypass lane and a reconstructed auxiliary lane. The project modified the number one and two lanes of the connector to serve as two general purpose lanes that merge into one general purpose lane just west of Tustin Avenue Off-ramp. The Tustin Avenue Off-ramp was reconfigured to a two-lane exit on the freeway and expand to four lanes at the end of the ramp. The project widened the Santa Ana River Bridge and installed retaining walls at various locations from east of the connector to Tustin Avenue. The project installed an overhead sign that spans the width of the Lakeview Avenue overcrossing. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Bridge projects in United States of America (USA)
- US 77 Victoria
- US 82 (West of Clarksville), US 82 (East of Clarksville) and US 82 Clarksville Loop Projects
- I-45 from the Galveston Causeway Bridge to 61st Street
- Yale Street Bridge
- SH 146 from FM 519 to Loop 197
- US 59 from CR 227 to Spur 10
- I-45 (FM 1764 to Galveston Causeway)
- FM 45 from the Mills County Line to Richland Springs North City Limit in San Saba County
