logo

SR-91 Westbound, SR-55 to Tustin Interchange

Sector: Bridge • Location: California, United States of America (USA)

Source: Orange County Transportation Authority

Project
Closed

This project was completed in 2016. OCTA and Caltrans District 12 relieved congestion and improved operational efficiency on the 91 freeway in the northeastern part of Anaheim. The project extended a westbound lane from the northbound (NB) SR-55/westbound (WB) SR-91 connector through the Tustin Avenue interchange. In addition, a westbound auxiliary lane from east of the NB SR-55/WB SR-91 connector

Project Information FAQ

Project Information

4 Q
The project “SR-91 Westbound, SR-55 to Tustin Interchange” is an infrastructure initiative in the Bridge sector, located in California, United States of America (USA). Taiyo aggregates data on it from Orange County Transportation Authority.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project was completed in 2016. OCTA and Caltrans District 12 relieved congestion and improved operational efficiency on the 91 freeway in the northeastern part of Anaheim. The project extended a westbound lane from the northbound (NB) SR-55/westbound (WB) SR-91 connector through the Tustin Avenue interchange. In addition, a westbound auxiliary lane from east of the NB SR-55/WB SR-91 connector to the Tustin Avenue off-ramp was reconstructed. The project added an additional Tustin Avenue exit bypass lane and a reconstructed auxiliary lane. The project modified the number one and two lanes of the connector to serve as two general purpose lanes that merge into one general purpose lane just west of Tustin Avenue Off-ramp. The Tustin Avenue Off-ramp was reconfigured to a two-lane exit on the freeway and expand to four lanes at the end of the ramp. The project widened the Santa Ana River Bridge and installed retaining walls at various locations from east of the connector to Tustin Avenue. The project installed an overhead sign that spans the width of the Lakeview Avenue overcrossing.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data