logo
ProjectConstruction Work Program

SR 92 @ SR 14 ALT - CFI

Sector: Road • Location: Union City, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

This is an intersection improvement project of the intersection of SR 92/Campbellton-Fairburn Rd & SR 14 Alternate/South Fulton Parkway. The intersection preferred alternative is a Displaced Left Turn otherwise known as a “Continuous Flow Intersection.” The project will begin and tie-in to PI 0017398 (Roundabout at SR 92/Campbellton-Fairburn Rd & Jones Rd) approximately 1000 ft south of the inters

Status
Under Construction
Sector
Road, Government
Location
Union City, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 92 @ SR 14 ALT - CFI

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 92 @ SR 14 ALT - CFI” is an infrastructure initiative in the Road sector, located in Union City, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This is an intersection improvement project of the intersection of SR 92/Campbellton-Fairburn Rd & SR 14 Alternate/South Fulton Parkway. The intersection preferred alternative is a Displaced Left Turn otherwise known as a “Continuous Flow Intersection.” The project will begin and tie-in to PI 0017398 (Roundabout at SR 92/Campbellton-Fairburn Rd & Jones Rd) approximately 1000 ft south of the intersection of SR 92 & Jones Rd, and end approximately 1550 ft south of the intersection of SR 92 and SR 14 Alt/South Fulton Parkway where the project will tie back into the existing 5-lane section. A varying raised median of 4-ft to 33-ft will be added along SR 92 from Thompson Road to McClure Road. The sideroads impacted by this project are Hall Road and Thompson Road, both with design speeds of 35 mph. Both sideroads intersect with SR 92 at signalized intersections.

Location

Country

United States of America (USA)

State

Georgia

City

Union City

Source

Source reliability

High

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Road, Government

Article published date

2024-01-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project