logo

SR 92 @ SR 16

Sector: Automotive • Location: Griffin, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The proposed improvement would provide dedicated southbound dual left turn lanes and a shared southbound thru-right turn lane. The additional left turn storage would require widening to the east into the existing island. The center-lane median would be reconstructed to provide safe separation between opposing vehicle movements along the northern leg of the intersection. The additional left turn la

Project Information FAQ

Project Information

4 Q
The project “SR 92 @ SR 16” is an infrastructure initiative in the Automotive sector, located in Griffin, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed improvement would provide dedicated southbound dual left turn lanes and a shared southbound thru-right turn lane. The additional left turn storage would require widening to the east into the existing island. The center-lane median would be reconstructed to provide safe separation between opposing vehicle movements along the northern leg of the intersection. The additional left turn lane would have a storage length of approximately 225’. Providing dedicated dual left turn lanes on the southbound approach is expected to significantly reduce the queuing and spillback observed during the AM and PM peak periods. The improvement will also allow for the removal of the split phasing, allowing the northbound and southbound approaches to run concurrently.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data