logo
ProjectUnder Construction

SR 92 FROM SR 3/US 41 TO GLADE ROAD

Sector: Car parking • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

The project proposes to widen SR 92/Lake Acworth Drive from US 41/SR 3/Cobb Parkway to Glade Road to a divided 4-lane facility with 11-foot lanes on the inside and 12-foot lanes on the outside, a raised concrete median varying from 8 to 20 feet in width, 16-foot shoulder with curb and gutter and a 10-foot multi-use trail on the east side of the roadway, 12-foot shoulder with curb and gutter and 5-

Status
Under Construction
Sector
Car parking, Bridge, Cement, Road, Government, Automotive
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 92 FROM SR 3/US 41 TO GLADE ROAD

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 92 FROM SR 3/US 41 TO GLADE ROAD” is an infrastructure initiative in the Car parking sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project proposes to widen SR 92/Lake Acworth Drive from US 41/SR 3/Cobb Parkway to Glade Road to a divided 4-lane facility with 11-foot lanes on the inside and 12-foot lanes on the outside, a raised concrete median varying from 8 to 20 feet in width, 16-foot shoulder with curb and gutter and a 10-foot multi-use trail on the east side of the roadway, 12-foot shoulder with curb and gutter and 5-foot sidewalk on the west side of the roadway. Within P.I. 0006862 there is a separate bridge replacement project P.I. 731865 over Lake Acworth. Lake Acworth will be spanned by a bridge approximately 1500-feet in length on new location. The proposed right-of-way varies from 100 to 135 feet. Total length of the project is approximately 2.8 miles.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Car parking, Bridge, Cement, Road, Government, Automotive

Article published date

2024-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project