logo

SR 92 Relocation & Widening

Sector: Automotive • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Active

Project is the first of three phases to relocate SR 92 through the City of Douglasville. It includes grade separation of relocated SR 92 at SR 5/US 78 Bankhead Hwy, at NSC RR and at Strickland Street. The project includes the closing of at-grade RR crossing at Brown Street, Mozley Street, and SR 92/Dallas HWY, while relocating the McCarley Street at-grade RR crossing 100' to the west of the existi

Project Information FAQ

Project Information

4 Q
The project “SR 92 Relocation & Widening” is an infrastructure initiative in the Automotive sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Project is the first of three phases to relocate SR 92 through the City of Douglasville. It includes grade separation of relocated SR 92 at SR 5/US 78 Bankhead Hwy, at NSC RR and at Strickland Street. The project includes the closing of at-grade RR crossing at Brown Street, Mozley Street, and SR 92/Dallas HWY, while relocating the McCarley Street at-grade RR crossing 100' to the west of the existing crossing for a better grade. Phase II: 0006901 Project is second of three phases to relocate SR 92 in the City of Douglasville. The project begins at Pine Drive (south of I-20 Interchange at SR 92) and goes north on new location to SR 5/US 78/Bankhead Highway where it will tie to phase one (PI# 0006900). Phase III: 720970- Project is the third of three phases to relocate SR 92 through the City of Douglasville. The project begins at the intersection of relocated SR 92 and relocated Ellis Street where it connects with Phase 1. It ends just north of the existing intersection of SR 92/Dallas Highway and Malone Road. Status: July 2021 Vehicle Control Schedule Beginning July 16, 2021, the railroad crossing at Campbellton Street will be closed to traffic. Construction of the ramp for the “right in, right out” section of Fairburn Road. (Estimated completion: July 19, 2021) Installation of pedestrian and roadway streetlights at the SR 92 bridge underpass (Estimated completion: End of Aug/Early Sep 2021). Safety Equipment Status 90% completed as of July 2021. Stopping Distance Utilities Utility relocation ongoing

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data