logo

SR 9/I-95 at SR 804/Boynton Beach Boulevard Interchange Improvements Project

Sector: Road • Location: Boynton Beach, Florida, United States

Source: Boca News Now

Project
Planned

This 2.354-mile project on SR 9/I-95 just north and south of Boynton Beach Boulevard including the on- and off-ramps, and on Boynton Beach Boulevard from Old Boynton Road to NW 3rd Avenue in the City of Boynton Beach, is expected to begin in July 2025. Work includes widening the SR 804/Boynton Beach Blvd. bridge over SR 9/I-95 to accommodate dual left turn lanes, adding additional turn lanes on th

Project Information FAQ

Project Information

5 Q
The project “SR 9/I-95 at SR 804/Boynton Beach Boulevard Interchange Improvements Project” is an infrastructure initiative in the Road sector, located in Boynton Beach, Florida, United States. Taiyo aggregates data on it from Boca News Now.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

planned

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This 2.354-mile project on SR 9/I-95 just north and south of Boynton Beach Boulevard including the on- and off-ramps, and on Boynton Beach Boulevard from Old Boynton Road to NW 3rd Avenue in the City of Boynton Beach, is expected to begin in July 2025. Work includes widening the SR 804/Boynton Beach Blvd. bridge over SR 9/I-95 to accommodate dual left turn lanes, adding additional turn lanes on the on-ramps and off-ramps, adding a third through-lane on westbound SR 804/Boynton Beach Blvd., milling and repaving, constructing bicycle lanes, replacing traffic signal mast arms, installing traffic monitoring cameras and Wrong Way Detection devices, upgrading curb ramps and sidewalks, retrofitting and installing new LED lighting, upgrading signage and pavement markings, and relocating trees and landscaping.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data