logo

SR 9/US 19 @ CSX #639817J IN ATLANTA

Sector: Hospital • Location: Atlanta, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

Project will replace the existing bridge on SR 9/US 19 over CSX Railroad in Atlanta, Georgia. The typical section of this segment of Peachtree Road includes 3 11-ft inside and 2 12-ft outside traffic lanes, a dedicated 11-ft NBLT and SBLT lane and urban shoulders, with sidewalk on each side. The total length of the project is approximately 600 linear feet. The project impacts multiple stakeholders

Project Information FAQ

Project Information

4 Q
The project “SR 9/US 19 @ CSX 639817J IN ATLANTA” is an infrastructure initiative in the Hospital sector, located in Atlanta, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Project will replace the existing bridge on SR 9/US 19 over CSX Railroad in Atlanta, Georgia. The typical section of this segment of Peachtree Road includes 3 11-ft inside and 2 12-ft outside traffic lanes, a dedicated 11-ft NBLT and SBLT lane and urban shoulders, with sidewalk on each side. The total length of the project is approximately 600 linear feet. The project impacts multiple stakeholders (City of Atlanta, MARTA, Atlanta Beltline, the railroad, businesses, hospitals, and residential apartments).Hence there is a need to reduce construction time and impact. Due to the significance of the route, ABC Construction techniques should be considered. If ABC Construction methods are used, total project construction time is 18 months with the roadway being closed for multiple short durations during construction. The duration increases to 36 months if conventional construction methods are used. During construction utilities on existing bridge will be relocated to a utility bridge.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data