logo
ProjectPre-Design

SR Mount Pleasant Solar - 50 MW

One of 10,000+ projects Taiyo tracks in Mississippi.

Source: Dodge USA

50 megawatt solar facility with about 150,000 ground-mounted solar panels 1,311 acres south of Highway 302 in Marshall County. To connect to TVA's 161kV transmission grid.

Status
Prospective
Sector
Power Generation (CCGT), Commercial, Road, Solar
Location
Mississippi, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about SR Mount Pleasant Solar - 50 MW

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR Mount Pleasant Solar - 50 MW” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Mississippi, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

50 megawatt solar facility with about 150,000 ground-mounted solar panels 1,311 acres south of Highway 302 in Marshall County. To connect to TVA's 161kV transmission grid.

Budget

Location

Country

United States of America (USA)

State

Mississippi

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Road, Solar

Article published date

2024-10-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project