SR20/Cascade Trail West Extension Phase 2A
One of 10,000+ projects Taiyo tracks in Washington.
Source: Dodge
Design and planning services to the Public Works Department for the SR20 Cascade Trail Phase 2A STPUS 0020(200). Design and planning services to the Public Works Department for the SR20 Cascade Trail Phase 2A STPUS 0020(200). Design Services include, at a minimum, the following: Preparation and submittal of intermediate (90%) and final (100%) design documents including drawings, specifications, an
- Status
- Closed
- Sector
- Road, Mass Transit, Commercial, Rail, Government
- Location
- Sedro-Woolley, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about SR20/Cascade Trail West Extension Phase 2A
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design and planning services to the Public Works Department for the SR20 Cascade Trail Phase 2A STPUS 0020(200). Design and planning services to the Public Works Department for the SR20 Cascade Trail Phase 2A STPUS 0020(200). Design Services include, at a minimum, the following: Preparation and submittal of intermediate (90%) and final (100%) design documents including drawings, specifications, and detailed cost estimates. Verify culvert design on the Brickyard Creek crossing. Geotechnical se... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Sedro-Woolley |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Mass Transit, Commercial, Rail, Government |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
