Sri Lanka: Kerawalapitiya - Port L Second Transmission Line Project

Sector: Water Supply and Storage • Location: Sri Lanka

Source: Asian Infrastructure Investment Bank (AIIB)

Project
Approved

The project involves constructing of approximately 16 kilometers (km) of 220kV single circuit underground transmission cable system from Kerawalapitiya Switching Station to Colombo Port L Grid Substation. Sri Lanka, through Ceylon Electricity Board (CEB), is undertaking the project to increase the transmission capacity of the electricity network to meet the growing electricity demand in the Greate

Project Information FAQ

Project Information

5 Q
The project “Sri Lanka: Kerawalapitiya - Port L Second Transmission Line Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Sri Lanka. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

approved

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves constructing of approximately 16 kilometers (km) of 220kV single circuit underground transmission cable system from Kerawalapitiya Switching Station to Colombo Port L Grid Substation. Sri Lanka, through Ceylon Electricity Board (CEB), is undertaking the project to increase the transmission capacity of the electricity network to meet the growing electricity demand in the Greater Colombo urban development area including the upcoming Colombo Port City. Project activities include designing, supplying, constructing, testing, and commissioning a single circuit 220kV insulated underground cable system from Kerawalapitiya Switching Station to Colombo Port L Grid Substation. This cable system will be the second underground cable connecting the two stations. The existing first underground cable along the same route was commissioned in 2019, and it will not be sufficient to ensure reliability in the electricity transmission considering the projected additional demand in Colombo. Also, considering the renewable energy potential of the country's northern part, enhancing transmission capacity from Kerawalapitiya Switching Substation to Colombo Port L Grid Substation is essential to ensure overall grid stability and uninterrupted power transmission from renewable energy resources.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data