logo

Sri Lanka: Sampur - Kappalthurai Transmission Infrastructure Development Project

Sector: Fertilizers • Location: Sri Lanka

Source: Asian Infrastructure Investment Bank (AIIB)

Project
Approved

The project involves building a new Grid Substation (GSS) in Sampur, a 38-kilometer (km), 220-kilovolt (kV) double-circuit transmission line from Sampur GSS to Kappalthurai GSS and extending two 220kV line bays at Kappalthurai GSS. CEB aims to create the necessary infrastructure to transmit power from the potential future renewable energy plants, including planned Sampur Solar PV plant. The Govern

Project Information FAQ

Project Information

5 Q
The project “Sri Lanka: Sampur - Kappalthurai Transmission Infrastructure Development Project” is an infrastructure initiative in the Fertilizers sector, located in Sri Lanka. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

approved

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves building a new Grid Substation (GSS) in Sampur, a 38-kilometer (km), 220-kilovolt (kV) double-circuit transmission line from Sampur GSS to Kappalthurai GSS and extending two 220kV line bays at Kappalthurai GSS. CEB aims to create the necessary infrastructure to transmit power from the potential future renewable energy plants, including planned Sampur Solar PV plant. The Government of Sri Lanka (GoSL) targets generating 70 percent of its electricity from renewable sources by 2030. The Renewable Energy Resource Development Plan 2021-2026 indicates that Sampur, Trincomalee region has the potential for around 300 MW of solar power generation. To capitalize on this potential, the CEB, with financial backing from AIIB, plans to expand the transmission network in the region. The following activities are planned in the project scope: Construction of 220(132)/33 kV GSS at Sampur and 2x220 kV transmission line bays at Kappalthurai GSS (initially charged at 132 kV); and Construction of around 38-km 220kV double circuit transmission line (initially charged at 132kV) from Kappalthurai to Sampur.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data