logo
ProjectProposed

Sri Lanka: Sampur - Kappalthurai Transmission Infrastructure Development Project

Proposed · Sri Lanka

Source: Asian Infrastructure Investment Bank (AIIB)

The project involves building a new Grid Substation (GSS) in Sampur, a 38-kilometer, 220-kilovolt (kV) double-circuit transmission line from Sampur GSS to Kappalthurai GSS and extending one 220kV line bay at Kappalthurai GSS. Ceylon Electricity Board (CEB) aims to create the necessary infrastructure to transmit power from the potential future renewable energy plants, including planned Sampur Solar

Status
Prospective
Sector
Water Supply and Storage, Solar, Telecommunications, Power Transmission, Residential, Commercial, Raw Materials, Road, Car parking, Government, Rail, Power Generation (CCGT), Automotive
Location
Sri Lanka
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about Sri Lanka: Sampur - Kappalthurai Transmission Infrastructure Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sri Lanka: Sampur - Kappalthurai Transmission Infrastructure Development Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Sri Lanka. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves building a new Grid Substation (GSS) in Sampur, a 38-kilometer, 220-kilovolt (kV) double-circuit transmission line from Sampur GSS to Kappalthurai GSS and extending one 220kV line bay at Kappalthurai GSS. Ceylon Electricity Board (CEB) aims to create the necessary infrastructure to transmit power from the potential future renewable energy plants, including planned Sampur Solar PV plant. The Government of Sri Lanka (GoSL) targets generating 70 percent of its electricity from renewable sources by 2030. The Renewable Energy Resource Development Plan 2021-2026 indicates that Sampur, Trincomalee region has the potential for around 300 MW of solar power generation. To capitalize on this potential, the CEB, with financial backing from AIIB, plans to expand the transmission network in the region. The following activities are planned in the project scope: Construction of 220/33 kV GSS at Sampur and 1x220 kV transmission line bay at Kappalthurai GSS; Construction of around 38-km 220kV double circuit transmission line (initially charged at 132kV) from Kappalthurai to Sampur.

Original sector

Energy

Budget

Location

Country

Sri Lanka

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Solar, Telecommunications, Power Transmission, Residential, Commercial, Raw Materials, Road, Car parking, Government, Rail, Power Generation (CCGT), Automotive

Article published date

2025-06-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project