Sri Lanka: Sampur - Kappalthurai Transmission Infrastructure Development Project
Sector: Solar • Location: Sri Lanka
Source: Asian Infrastructure Investment Bank (AIIB)
The Project involves building a new Grid Substation (GSS) in Sampur, a 38-kilometer (km), 220-kilovolt (kV) double-circuit transmission line from Sampur GSS to Kappalthurai GSS and extending one 220kV line bay at Kappalthurai GSS. Ceylon Electricity Board (CEB) aims to create the necessary infrastructure to transmit power from the potential future renewable energy plants, including planned Sampur
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | proposed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project involves building a new Grid Substation (GSS) in Sampur, a 38-kilometer (km), 220-kilovolt (kV) double-circuit transmission line from Sampur GSS to Kappalthurai GSS and extending one 220kV line bay at Kappalthurai GSS. Ceylon Electricity Board (CEB) aims to create the necessary infrastructure to transmit power from the potential future renewable energy plants, including planned Sampur Solar PV plant. The Government of Sri Lanka targets at generating 70 percent of its electricity from renewable sources by 2030. The Renewable Energy Resource Development Plan 2021-2026 indicates that Sampur, Trincomalee region has the potential for around 300 MW of solar power generation. To capitalize on this potential, the CEB, with financial backing from AIIB, plans to expand the transmission network in the region. The following activities are planned in the Project scope: Construction of 220/33 kV GSS at Sampur and 1x220 kV transmission line bay at Kappalthurai GSS; and Construction of around 38-km 220kV double circuit transmission line (initially charged at 132kV) from Kappalthurai to Sampur. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Solar projects in Sri Lanka
- LG CNS Solar Plant
- Kankesanturai Wind/Solar Power Plant
- Energy Services Delivery (ESD) Program
- Pooneryn Hybrid Solar PV Park-3
- Pooneryn Hybrid Solar PV Park-2
- Pooneryn Hybrid Solar PV Park-1
- Sri Lanka: Sampur - Kappalthurai Transmission Infrastructure Development Project
- Sri Lanka: Sampur - Kappalthurai Transmission Infrastructure Development Project
