Sri Lanka: Sampur - Kappalthurai Transmission Infrastructure Development Project
Proposed · Sri Lanka
Source: Asian Infrastructure Investment Bank (AIIB)
The Project involves building a new Grid Substation (GSS) in Sampur, a 38-kilometer (km), 220-kilovolt (kV) double-circuit transmission line from Sampur GSS to Kappalthurai GSS and extending one 220kV line bay at Kappalthurai GSS. Ceylon Electricity Board (CEB) aims to create the necessary infrastructure to transmit power from the potential future renewable energy plants, including planned Sampur
- Status
- Prospective
- Sector
- Government, Solar, Consumer Products, Road, Rail, Raw Materials, Fertilizers, Car parking, Commercial, Power Generation (CCGT), Automotive, Residential, Power Transmission, Manufacturing (Industrial)
- Location
- Sri Lanka
- Updated
- 22 Jul 2026
- Source
- Asian Infrastructure Investment Bank (AIIB)
ConstructChat
Ask ConstructChat about Sri Lanka: Sampur - Kappalthurai Transmission Infrastructure Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project involves building a new Grid Substation (GSS) in Sampur, a 38-kilometer (km), 220-kilovolt (kV) double-circuit transmission line from Sampur GSS to Kappalthurai GSS and extending one 220kV line bay at Kappalthurai GSS. Ceylon Electricity Board (CEB) aims to create the necessary infrastructure to transmit power from the potential future renewable energy plants, including planned Sampur Solar PV plant. The Government of Sri Lanka targets at generating 70 percent of its electricity from renewable sources by 2030. The Renewable Energy Resource Development Plan 2021-2026 indicates that Sampur, Trincomalee region has the potential for around 300 MW of solar power generation. To capitalize on this potential, the CEB, with financial backing from AIIB, plans to expand the transmission network in the region. The following activities are planned in the Project scope: Construction of 220/33 kV GSS at Sampur and 1x220 kV transmission line bay at Kappalthurai GSS; and Construction of around 38-km 220kV double circuit transmission line (initially charged at 132kV) from Kappalthurai to Sampur. |
Original sector | Energy |
Budget |
Location
Country | Sri Lanka |
Source
Source | Asian Infrastructure Investment Bank (AIIB) |
URL |
More Details
Record type | Project |
Sector | Government, Solar, Consumer Products, Road, Rail, Raw Materials, Fertilizers, Car parking, Commercial, Power Generation (CCGT), Automotive, Residential, Power Transmission, Manufacturing (Industrial) |
Article published date | 2025-09-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
