The Project involves the design, engineering, construction, commissioning, operation, and maintenance of a 120MW ground-mounted solar photovoltaic (PV) project in Sampur, Sri Lanka (the “Project”). CEB has entered into a Joint Venture & Shareholders' Agreement (JVSHA) with NTPC Limited (NTPC) (collectively, the Sponsors) for equal equity participation in Trincomalee Power Company Limited (TPCL). T

Status
Prospective
Sector
Water Supply and Storage, Nuclear, Power Generation (CCGT), Warehouse, Wind, Solar, Road, Commercial, Government, Education, Residential, Manufacturing (Industrial)
Location
Sri Lanka
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about Sri Lanka: Sampur Solar PV Power Project Financing

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sri Lanka: Sampur Solar PV Power Project Financing” is an infrastructure initiative in the Water Supply and Storage sector, located in Sri Lanka. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project involves the design, engineering, construction, commissioning, operation, and maintenance of a 120MW ground-mounted solar photovoltaic (PV) project in Sampur, Sri Lanka (the “Project”). CEB has entered into a Joint Venture & Shareholders' Agreement (JVSHA) with NTPC Limited (NTPC) (collectively, the Sponsors) for equal equity participation in Trincomalee Power Company Limited (TPCL). TPCL is the Project Implementing Entity (PIE) responsible for the design, engineering, financing, construction, commissioning, operation, and maintenance of the Project on a Build-Own-Operate (BOO) basis. The Project will be developed in two phases - Phase I capacity of 50 MW followed by Phase II capacity of 70 MW. The Project cost has been estimated at USD 144 million (for Phase I and Phase II capacity together), expected to be funded on a debt-to-equity ratio of 75:25. The equity portion will be equally shared by NTPC and CEB. AIIB will provide Sovereign Backed Financing loan to Ministry of Finance, Government of Sri Lanka (GOSL) to fund up to USD 20 million of Project related expenditures such as solar PV modules, other key equipment, balance of plant costs, financing costs, etc. This financing to GOSL is considering CEB's 50 percent equity stake in TPCL. The Project senior debt financing will be led by AIIB on non-sovereign basis with co-financing from the Asian Development Bank (ADB) and other potential lenders.

Original sector

Energy

Budget

Location

Country

Sri Lanka

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Nuclear, Power Generation (CCGT), Warehouse, Wind, Solar, Road, Commercial, Government, Education, Residential, Manufacturing (Industrial)

Article published date

2025-12-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project