logo
ProjectOpenBP

SRVCHG 10 Pleasant ST

Sector: Power Transmission • Location: Hyde Park, Massachusetts, United States of America

Source: City of Boston

Service Conductor Refeed - Utility meter shows signs of damage and must be replaced before PV Installation - Replace with new Meter/Main Combo - 100 AMP at site

Status
Prospective
Sector
Power Transmission, Power Generation (CCGT), Commercial, Government, Solar
Location
Hyde Park, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about SRVCHG 10 Pleasant ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SRVCHG 10 Pleasant ST” is an infrastructure initiative in the Power Transmission sector, located in Hyde Park, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Service Conductor Refeed - Utility meter shows signs of damage and must be replaced before PV Installation - Replace with new Meter/Main Combo - 100 AMP at site

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Hyde Park

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT), Commercial, Government, Solar

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project