SRVCHG 55 Maxwell ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Service upgrade. Replace tap box in basement. Install new 200a disconnect above tap box to feed new location of meter bank on exterior. Each tenant panel to have disconnecting means on exterior. Install new panels. Install 2 electric dryer and 2 washer circuits in basement.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about SRVCHG 55 Maxwell ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Service upgrade. Replace tap box in basement. Install new 200a disconnect above tap box to feed new location of meter bank on exterior. Each tenant panel to have disconnecting means on exterior. Install new panels. Install 2 electric dryer and 2 washer circuits in basement. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
