SS CdI
One of 295 projects Taiyo tracks in Cote D'Ivoire.
Source: IFC Project Disclosures
The proposed investment supports the construction and operation of two solar photovoltaic (PV) plants in the Bafing region of Cote d’Ivoire (the “Project”). With a combined area of 100 ha, the plants will have installed capacities of 44 MWac in Touba covering 50 ha and 36 MWac in Laboa, covering 50 ha.Each plant will be developed and operated by a dedicated special purpose vehicle (SPV) incorporat
- Status
- Prospective
- Sector
- Road, Energy Storage, Power Generation (CCGT), Wind, Solar
- Location
- Cote d'Ivoire
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about SS CdI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The proposed investment supports the construction and operation of two solar photovoltaic (PV) plants in the Bafing region of Cote d’Ivoire (the “Project”). With a combined area of 100 ha, the plants will have installed capacities of 44 MWac in Touba covering 50 ha and 36 MWac in Laboa, covering 50 ha.Each plant will be developed and operated by a dedicated special purpose vehicle (SPV) incorporated in Cote D’ivoire, Touba Solar PV S.A. and Laboa Solar PV S.A. The Project is sponsored by Infinity Power B.V (Infinity Power), a joint venture between Infinity and Masdar and one of Africa’s leading renewable energy developers. Infinity Power targets power generation projects across Africa through renewable energy sources, namely solar and wind, as well as other technologies such as battery storage, leading the development, construction and operation of independent power production projects. The company has an operational portfolio of 1.3 GW across Egypt, South Africa and Senegal. The Touba PV plant will be connected to an existing substation via the existing overhead transmission line (OHTL), which runs along the eastern boundary of the site. In addition, the Project includes the construction of an approximately 17 km, 90 kV OHTL as an associated facility to connect the Laboa PV plant to the Laboa substation. The new OHTL will comprise: (i) the reconstruction of an approximately 10 km segment of the existing line; and (ii) the construction of a new approximately 7.4 km section installed parallel to the existing line. Upon completion, the new OHTL will be transferred to and operated by Compagnie Ivorienne d’Electricite (CI-Energies).Access to the Project sites might require the upgrade of an existing approximately 23 km road, to be confirmed following the appointment of the Engineering, Procurement and Conctruction (EPC) contractor. Both PV plants will be fully fenced. The Project is currently at the design stage and is expected to be completed within approximately 15 months from construction start, under a turnkey, fixed-price EPC contract. The selection of the EPC contractor is ongoing, with construction expected to commence in Q1 2027.Infinity and Masdar are existing IFC clients. IFC's appraisal also considered their E&S performance on existing investments under supervision (link to project disclosure below).https://disclosures.ifc.org/project-detail/ED/44364/z-r-fsh-n-windhttps://disclosures.ifc.org/project-detail/ESRS/44364/zarafshon-wind |
Original sector | V-BF - Solar - Renewable Energy Generation |
Location
Country | Cote d'Ivoire |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Road, Energy Storage, Power Generation (CCGT), Wind, Solar |
Article published date | 2026-09-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project