SSRP Hydraulic System Upgrades
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The objective of this work is to complete the removal and remediation of old electrical and hydraulic control equipment followed by the installation of new electric and hydraulic control circuits at both the Gardiner Dam Tunnel Control 5 and Qu Appelle River Dam structures. The work also includes a full electrical upgrade at Qu Appelle River Dam, and the provision of two mobile backup hydraulic pu
- Status
- Closed
- Sector
- Hydro, Power Generation (CCGT), Tunnel, Government, Commercial, Manufacturing (Industrial), Water Supply and Storage
- Location
- Moose Jaw, Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about SSRP Hydraulic System Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of this work is to complete the removal and remediation of old electrical and hydraulic control equipment followed by the installation of new electric and hydraulic control circuits at both the Gardiner Dam Tunnel Control 5 and Qu Appelle River Dam structures. The work also includes a full electrical upgrade at Qu Appelle River Dam, and the provision of two mobile backup hydraulic pumps and installed backup hydraulic connection circuits at each location. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Saskatchewan |
City | Moose Jaw |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Tunnel, Government, Commercial, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
