SSWRF Blower Branch Pipe Replacement
Sector: Water Supply and Storage • Location: Oak Creek, Wisconsin, United States of America
Source: Dodge USA
The project contemplated consists of: ,br> Excavation, water control, backfill, and surface restoration Protect active utilities and remove abandoned utilities in excavation Provide mechanical bulkheads for temporary isolation of blower branch piping Provide ventilation, cooling, and manned entry to the buried air header Remove buried blower branch piping Remove buried air header and blower branch
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | GC Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project contemplated consists of: ,br> Excavation, water control, backfill, and surface restoration Protect active utilities and remove abandoned utilities in excavation Provide mechanical bulkheads for temporary isolation of blower branch piping Provide ventilation, cooling, and manned entry to the buried air header Remove buried blower branch piping Remove buried air header and blower branch piping coating including coal tar enamel and asbestos Provide weld patching of corroded air head... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
