logo

St. Aubin Power Project

Sector: Commercial • Location: Mauritius

Source: World Bank Group

Project
Active

The St Aubin Power Project is a 34 MW power plant fueled by bagasse (a sugarcane byproduct) and coal built by the Compagnie Thermique du Sud Limitée (CTDS), along with a 66kV transmission line to connect the plant to the electricity grid. The plant sells electricity to the Central Electricity Board (the state-owned and operated energy provider for Mauritius) under a 20-year Power Purchase Agreeme

Project Information FAQ

Project Information

5 Q
The project “St. Aubin Power Project” is an infrastructure initiative in the Commercial sector, located in Mauritius. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The St Aubin Power Project is a 34 MW power plant fueled by bagasse (a sugarcane byproduct) and coal built by the Compagnie Thermique du Sud Limitée (CTDS), along with a 66kV transmission line to connect the plant to the electricity grid. The plant sells electricity to the Central Electricity Board (the state-owned and operated energy provider for Mauritius) under a 20-year Power Purchase Agreement signed in May 2003, resulting from a competitive tender process. CTDS was jointly owned by the Compagnie Energie Sud Limitee (Mauritius, 60%), Séchilienne-SIDEC (France, 25%) and the publicly listed Sugar Investment Trust (15%). Compagnie Energie Sud Limitee was itself a joint venture bewteen Mon Tresor Mon Desert Limited (30.5%), The Savannah Sugar Estates Co. Ltd. (24%), Societe Union St Aubin (24%) and Compagnie de Beau Vallon Ltee (21.5%). The project reached financial closure in July 2004, and was financed through from an 80%/20% mixture of debt/equity. Debt was issued locally and was arranged through the Mauritius Commercial Bank Limited and Barclays Bank Plc. Construction was to be completed in October 2005. The St Aubin project was one of eleven privately owned bagasse-fueled generation plants in operation in 2005 (seven of which operate only during harvesting season), which collectively provide 40% of Mauritius’ electricity supply. http://www.freehills.com.au/publications/publications_1399.asp

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data