St. Bernard Bridge Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The project involves replacing and relocating the existing two-lane St. Bernard Bridge on U.S. Highway 278 East that crosses Eight Mile Creek. It will widen U.S. Highway 278 from Fourth Avenue to just beyond St. Bernard Drive, aligning the adjoining roadway and approaches with the new bridge. This enhancement aims to alleviate congestion and improve overall roadway connectivity.
- Status
- Prospective
- Sector
- Government, Road, Bridge, Commercial
- Location
- Cullman, Alabama, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about St. Bernard Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project involves replacing and relocating the existing two-lane St. Bernard Bridge on U.S. Highway 278 East that crosses Eight Mile Creek. It will widen U.S. Highway 278 from Fourth Avenue to just beyond St. Bernard Drive, aligning the adjoining roadway and approaches with the new bridge. This enhancement aims to alleviate congestion and improve overall roadway connectivity. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Cullman |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Road, Bridge, Commercial |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
