St. Clair West Condominium Towers Development
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
A proposal facilitate the development of the site for 3 mixed-use towers having heights of 30, 40, and 45 storeys atop podiums with ranging heights of 3-8 storeys. The proposed non-residential gross floor area is 11,025 square metres, and the proposed residential gross floor area is 97,037 square metres. A total of 1151 residential dwelling units are proposed
- Status
- Prospective
- Sector
- Cement, Manufacturing (Industrial), Warehouse, Residential, Commercial, Car parking, Automotive
- Location
- Toronto, Ontario, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about St. Clair West Condominium Towers Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | A proposal facilitate the development of the site for 3 mixed-use towers having heights of 30, 40, and 45 storeys atop podiums with ranging heights of 3-8 storeys. The proposed non-residential gross floor area is 11,025 square metres, and the proposed residential gross floor area is 97,037 square metres. A total of 1151 residential dwelling units are proposed |
Budget |
Location
Country | Canada |
State | Ontario |
City | Toronto |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Manufacturing (Industrial), Warehouse, Residential, Commercial, Car parking, Automotive |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
- Kearl Ore Preparation Plant
- Molson Brewery Expansion
- Air Products Hydrogen Plant Civil Construction
- McMath Secondary School
