logo

St Croix River Crossing

Sector: Bridge • Location: United States

Source: Road Traffic Technology

Project
Closed

Artist’s rendering showing the aerial view of St Croix river crossing. Credit: Minnesota Department of Transportation. Construction of the St Croix river crossing began in May 2013. Credit: Minnesota Department of Transportation. The new bridge was opened to traffic in August 2017. Credit: Minnesota Department of Transportation. St Croix River Crossing is a new four-lane bridge that replaced the 8

Project Information FAQ

Project Information

5 Q
The project “St Croix River Crossing” is an infrastructure initiative in the Bridge sector, located in United States. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Artist’s rendering showing the aerial view of St Croix river crossing. Credit: Minnesota Department of Transportation. Construction of the St Croix river crossing began in May 2013. Credit: Minnesota Department of Transportation. The new bridge was opened to traffic in August 2017. Credit: Minnesota Department of Transportation. St Croix River Crossing is a new four-lane bridge that replaced the 80-year-old Stillwater Lift Bridge, which connects Oak Park Heights, Minnesota and St Joseph, Wisconsin, US. The project included the construction of seven miles (11.26km) of expressways on either side of the bridge in Minnesota and Wisconsin. The Stillwater Bridge will be converted into a 4.7-mile (7.5km) trail facility for pedestrians and bicyclists. Construction of the river crossing began in May 2013 and was completed in August 2017. The Minnesota Department of Transportation played a lead role in the project in partnership with the Wisconsin Department of Transportation. The bridge was initially planned to be opened for traffic by the end of 2016, but due to confined spaces and complex work related to pre-cast segments, the inauguration was held in August 2017. The raising of the 1,050ft-long Stillwater Bridge to allow boats to travel across St Croix River often causes traffic congestion in Stillwater and Houlton, Wisconsin. The bridge is also prone to flooding in spring. The project will avoid flooding and large traffic congestion issues that are often caused by the existing bridge. The St Croix crossing is the second extra-dosed, cable-stayed bridge in the US after thePearl Harbor Memorial Bridgein Connecticut. The new structure features a hybrid design comprising a concrete box girder and a cable-stayed structure. It included the construction of ramp bridges from Highway 95 to the river crossing and vice-versa, as well as a box girder approach bridge on Highway 36 and a connecting structure between the river bridge and Highway 36 approach bridge. The bridge deck consists of a crossbeam, pier table and driving surface constructions. Each crossbeam is 116.4ft-long, 15.2ft-wide and 18.2ft-high. A total of 330 pre-cast segments were trucked from the on-site casting yard to the bridge areas. An additional 650 pre-cast segments were barged to the river bridge from Grey Cloud Island casting yard in Cottage Grove. The bridge is lower in height, which minimises environmental impacts by keeping tower heights below the river bluffs and also reduces the number of piers in the river to five. Columbia River Crossing (CRC) was the replacement of the 90-year-old Interstate-5 bridge, which spans from SR500 in Vancouver, Washington to Victory Boulevard in Portland, Oregon. An official ground-breaking was held for the river crossing project in May 2013. All works on the bridge foundations and footings below the water surface were completed in 2013. Construction work on all five pier locations began in June 2014. Installation work of pre-cast river bridge segments and tower construction at pier nine in Minnesota shoreline and tower construction at Pier 12 in Wisconsin shoreline were completed in 2015. Construction of the bicycle and pedestrian trail began in 2015 and will be completed by 2019. Architectural and engineering firm HDR in association with Buckland & Taylor was awarded a $14.2m contract in June 2012 to provide lead design services for the St CroixBridgeproject. The Lunda-Ames joint venture was awarded the $332.5m lead construction contract of the St Croix Bridge superstructure in November 2013. J & L Steel and Electrical Services were contracted to install the reinforcing steel, post-tension and electrical materials on the superstructure of the St Croix crossing in February 2014. Aggregate Industries was awarded the contract to provide pre-cast bridge girders. The estimated cost of the river crossing bridge was approximately $646m and was financed by Minnesota and Wisconsin, with the former funding the majority.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data