logo

St-Jean Reconstruction Phase 2A

Sector: Hydro • Location: Clarence-Rockland, Ontario, Canada

Source: Dodge

Project
Closed

St-jean Reconstruction Phase 2A Earth Movement & Box Culvert Replacement. Phase 2A consist of removing the peat and soft clay within the wetland, replacing with sound material and installing a box culvert. The purpose of Phase 2A is to re-build the Hydro line and other utilities on top of the future elevated road and to remove the existing utilities, including the existing hydro line, pedestals an

Status
Closed
Sector
Hydro, Government, Road, Waste Processing and Treatment, Power Transmission, Commercial, Water Supply and Storage, Power Generation (CCGT)
Location
Clarence-Rockland, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about St-Jean Reconstruction Phase 2A

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “St-Jean Reconstruction Phase 2A” is an infrastructure initiative in the Hydro sector, located in Clarence-Rockland, Ontario, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

St-jean Reconstruction Phase 2A Earth Movement & Box Culvert Replacement. Phase 2A consist of removing the peat and soft clay within the wetland, replacing with sound material and installing a box culvert. The purpose of Phase 2A is to re-build the Hydro line and other utilities on top of the future elevated road and to remove the existing utilities, including the existing hydro line, pedestals and other related works. Phase 2A schedule is as follows: Tree clearing shall be completed by April...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Clarence-Rockland

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Hydro, Government, Road, Waste Processing and Treatment, Power Transmission, Commercial, Water Supply and Storage, Power Generation (CCGT)

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project