St Julien ByPass
Closed · Mauritius · Last reported Aug 2018
Source: Road Development Authority (RDA), Mauritius (Projects)
On Tuesday 21st Aug 2018, the opening of the St Julien Bypass (co-project between the Road Development Authority, Mauritius and Transinvest Contruction Ltd) was inaugurated by Hon Pravind Kumar JUGNAUTH, Prime Minister of Mauritius. The St Julien Bypass starts with a roundabout along Higginson (B24) Road before the village of St Julien d’Hotman, bypasses the village over a total stretch of 3.5km a
- Status
- Closed
- Sector
- Automotive, Road, Government
- Location
- Mauritius
- Updated
- 22 Jul 2026
- Source
- Road Development Authority (RDA), Mauritius (Projects)
ConstructChat
Ask ConstructChat about St Julien ByPass
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | On Tuesday 21st Aug 2018, the opening of the St Julien Bypass (co-project between the Road Development Authority, Mauritius and Transinvest Contruction Ltd) was inaugurated by Hon Pravind Kumar JUGNAUTH, Prime Minister of Mauritius. The St Julien Bypass starts with a roundabout along Higginson (B24) Road before the village of St Julien d’Hotman, bypasses the village over a total stretch of 3.5km and ends with a T-Junction along B24 Road. The project will:Improve road geometry and enhance safety for both pedestrians and vehicles.Bypass existing built up areas at St Julien d’Hotman Village, ensuring the safety of residents.Decrease travel time and vehicle operating costs.Click here to view Drone View Video of the project |
Location
Country | Mauritius |
Source
Source reliability | Medium |
Source | Road Development Authority (RDA), Mauritius (Projects) |
URL |
More Details
Record type | Project |
Sector | Automotive, Road, Government |
Article published date | 2023-07-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in Mauritius
- Suzlon Plaine Sophie Wind Farm
- Construction of an Interchange at Hillcrest across Motorway M1
- Landslide/Slope Stability Treatment along B104 road (Baie du Cap – Chamarel – Case Noyale) at Chamarel
- Construction of a Flyover at Quay D Roundabout
- Upgrading of B28 Road(Lot 3) from Deux Frères to Beau Champ (Phase 1)
- Construction of a Fly-Over on Motorway M2 at Terre Rouge Roundabout (Design-Build/Turnkey)
- Traffic Congestion Relieving Measures at B32/B143 Junction (Vallee des Pretres Region)
- Construction of a Bridge at Baie du Tombeau (in lieu of Pont Bruniquel)
