St Mary Solar Farm
Sector: Solar • Location: St Mary, Jersey
Source: BBC
A proposal to install 9,000 solar panels on land at Champs Verts in St Mary as part of Jersey Electricity's Solar 5000 programme, aiming to generate 25 megawatts of local solar power by 2027. The project has been paused and is under review following opposition from local residents and withdrawal of the planning application in early 2025.
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT), Raw Materials
- Location
- St Mary, United Kingdom
- Updated
- 22 Jul 2026
- Source
- BBC
ConstructChat
Ask ConstructChat about St Mary Solar Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | paused |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A proposal to install 9,000 solar panels on land at Champs Verts in St Mary as part of Jersey Electricity's Solar 5000 programme, aiming to generate 25 megawatts of local solar power by 2027. The project has been paused and is under review following opposition from local residents and withdrawal of the planning application in early 2025. |
Original sector | Energy |
Location
Country | United Kingdom (UK) |
City | St Mary |
Source
Source | BBC |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Raw Materials |
Article published date | 2026-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
