St. Norbert Spillway Modifications
Closed · Manitoba · Last reported Oct 2022
Source: Dodge USA
Modifications to the existing St. Norbert Dam fixed crest rock overflow dam including construction of a new cast-in-place concrete chute to improve fish passage during low level flows. The modifications to the existing overflow dam also include partial demolition of the remnant St. Norbert concrete dam, regrading of the downstream slope, and construction of a riprap-lined recovery pool at the down
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Cement, Hydro, Waste Processing and Treatment
- Location
- La Salle, Manitoba, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about St. Norbert Spillway Modifications
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Modifications to the existing St. Norbert Dam fixed crest rock overflow dam including construction of a new cast-in-place concrete chute to improve fish passage during low level flows. The modifications to the existing overflow dam also include partial demolition of the remnant St. Norbert concrete dam, regrading of the downstream slope, and construction of a riprap-lined recovery pool at the downstream toe of the dam. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Manitoba |
City | La Salle |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Cement, Hydro, Waste Processing and Treatment |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
