St. Philips WWTP Treatment Expansion
Sector: Water Supply and Storage • Location: Newfoundland and Labrador, Canada
Source: Infrastructure Canada
The expansion of the St Philips Sequential Batch Reactor (SBR) Treatment System requires for the existing third train tankage to be activated providing for additional biological treatment and increasing the hydraulic load capability to allow for a population increase from 1500 to 2250 and hydraulic peak flow from 29 L/sec to 43 L/sec. The work includes for the following: - Provision for the supply
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | in progress |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The expansion of the St Philips Sequential Batch Reactor (SBR) Treatment System requires for the existing third train tankage to be activated providing for additional biological treatment and increasing the hydraulic load capability to allow for a population increase from 1500 to 2250 and hydraulic peak flow from 29 L/sec to 43 L/sec. The work includes for the following: - Provision for the supply and installation of all tankage process internals such as jet aeration, feed and waste sludge pumps, sensors, floats, effluent decanter, control valves, pipework and all ancillary support equipment such as an additional positive displacement blower to provide for a fully functioning treatment biological process. -New main control PLC panel replacing the existing which shall be design to provide an operational control system for all three treatment trains with the latest technologies. - New dissolved oxygen, suspended solids and pH monitor for all three treatment trains - SCADA" - Perform concrete repairs and applying waterproofing to the interior of Train 1,2 and 3 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
