logo
ProjectPre-Construction

St. Philips WWTP Treatment Expansion

Pre-construction · Newfoundland and Labrador

Source: Infrastructure Canada

The project consists of expanding the St Philips Sequential Batch Reactor (SBR) Treatment System. It requires expanding for the existing third train tankage to be activated providing for additional biological treatment and increasing the hydraulic load capability to allow for a population increase from 1500 to 2250 and hydraulic peak flow from 29 L/sec to 43 L/sec. The work includes for the follow

Status
Prospective
Sector
Water Supply and Storage, Waste Processing and Treatment, Nuclear, Rail, Government
Location
Newfoundland and Labrador, Canada
Updated
19 Nov 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about St. Philips WWTP Treatment Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “St. Philips WWTP Treatment Expansion” is an infrastructure initiative in the Water Supply and Storage sector, located in Newfoundland and Labrador, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The project consists of expanding the St Philips Sequential Batch Reactor (SBR) Treatment System. It requires expanding for the existing third train tankage to be activated providing for additional biological treatment and increasing the hydraulic load capability to allow for a population increase from 1500 to 2250 and hydraulic peak flow from 29 L/sec to 43 L/sec. The work includes for the following: - Provision for the supply and installation of all tankage process internals such as jet aeration, feed and waste sludge pumps, sensors, floats, effluent decanter, control valves, pipework and all ancillary support equipment such as an additional positive displacement blower to provide for a fully functioning treatment biological process. - New main control PLC panel replacing the existing which shall be design to provide an operational control system for all three treatment trains with the latest technologies. - New dissolved oxygen, suspended solids and pH monitor for all three treatment trains - SCADA control system architecture

Original sector

Drinking Water and Wastewater

Budget

Location

Country

Canada

State

Newfoundland and Labrador

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Nuclear, Rail, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project