St. Stephen Border Crossing
Sector: Power Generation (CCGT) • Location: Canada
Source: Bird Construction
Challenged by the remote location that left the crew without electrical power for the first six months, the ingenuity of the team was the remedy to the limited accessibility of services. To ensure the continuous availability of materials for the road work, a rock crusher and asphalt plant were erected on site, reducing the roadwork schedule. When the onset of excessive ground water threatened to d
- Status
- Unknown
- Sector
- Power Generation (CCGT), Water Supply and Storage, Road, Commercial, Government
- Location
- Canada
- Updated
- 22 Jul 2026
- Source
- Bird Construction
ConstructChat
Ask ConstructChat about St. Stephen Border Crossing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | unknown |
Taiyo status | Unknown |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Challenged by the remote location that left the crew without electrical power for the first six months, the ingenuity of the team was the remedy to the limited accessibility of services. To ensure the continuous availability of materials for the road work, a rock crusher and asphalt plant were erected on site, reducing the roadwork schedule. When the onset of excessive ground water threatened to delay the foundation work, the application of generator powered dewatering pumps allowed construction to continue. The greatest hurdle was the worst winter in decades that blew 12 foot snowdrifts and impeded site snow clearing. On average, two work days each week were lost through the winter months, thus requiring Bird's crews to double up in the spring in order to maintain the schedule. |
Procurement method |
Location
Country | Canada |
Source
Source reliability | High |
Source | Bird Construction |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Water Supply and Storage, Road, Commercial, Government |
Article published date | 2023-11-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Canada
- Site C Worker Accommodation
- Canadian Tire Corporate Office Interior Renovation
- Brock University's Marilyn I. Walker School of Fine and Performing Arts
- Molson Brewery Expansion
- Air Products Hydrogen Plant Civil Construction
- Osgoode Hall Law School
- Toronto Airport Piers D and E Fixed Bridges
- Medicine Hat Energy Centre
