logo

St. Stephen Border Crossing

Sector: Power Generation (CCGT) • Location: Canada

Source: Bird Construction

Project
Unknown

Challenged by the remote location that left the crew without electrical power for the first six months, the ingenuity of the team was the remedy to the limited accessibility of services. To ensure the continuous availability of materials for the road work, a rock crusher and asphalt plant were erected on site, reducing the roadwork schedule. When the onset of excessive ground water threatened to d

Project Information FAQ

Project Information

4 Q
The project “St. Stephen Border Crossing” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Canada. Taiyo aggregates data on it from Bird Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

unknown

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Challenged by the remote location that left the crew without electrical power for the first six months, the ingenuity of the team was the remedy to the limited accessibility of services. To ensure the continuous availability of materials for the road work, a rock crusher and asphalt plant were erected on site, reducing the roadwork schedule. When the onset of excessive ground water threatened to delay the foundation work, the application of generator powered dewatering pumps allowed construction to continue. The greatest hurdle was the worst winter in decades that blew 12 foot snowdrifts and impeded site snow clearing. On average, two work days each week were lost through the winter months, thus requiring Bird's crews to double up in the spring in order to maintain the schedule.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data