logo

St. Tammany Flood Risk Management Project

Sector: Aerospace & Defense • Location: Louisiana, United States

Source: WWNO

Project
Planned

The St. Tammany Flood Risk Management Project aims to build an 18.5-mile levee and floodwall system to protect over 26,000 structures in St. Tammany Parish, Louisiana, with a total project cost of $5.9 billion.

Status
Prospective
Sector
Aerospace & Defense, Water Supply and Storage, Government
Location
Louisiana, United States of America
Updated
22 Jul 2026
Source
WWNO

ConstructChat

Ask ConstructChat about St. Tammany Flood Risk Management Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “St. Tammany Flood Risk Management Project” is an infrastructure initiative in the Aerospace & Defense sector, located in Louisiana, United States. Taiyo aggregates data on it from WWNO.

Participants

Sponsoring Agency

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The St. Tammany Flood Risk Management Project aims to build an 18.5-mile levee and floodwall system to protect over 26,000 structures in St. Tammany Parish, Louisiana, with a total project cost of $5.9 billion.

Original sector

Flood Control

Budget

Location

Country

United States of America (USA)

State

Louisiana

Source

Source

WWNO

URL

More Details

Record type

Project

Sector

Aerospace & Defense, Water Supply and Storage, Government

Article published date

2025-01-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project