STA-Colonial Blvd NE Phase 2 Gp 1428
Sector: Car parking • Location: Canton, Ohio, United States of America
Source: Dodge USA
The project consists of pavements reconstruction, replacement of existing sidewalk and curb, and the construction of a shared use path along Colonial Boulevard between Rowland Ave. and Maple Ave. NE. in the boulevard. Lighting, waterlines sanitary and drainage facilities will also be upgraded as prat of this project. There are approximately 72 par r Right of Way Acquisition Services for STA-COLONI
- Status
- Closed
- Sector
- Car parking, Commercial, Road, Government, Automotive, Waste Processing and Treatment
- Location
- Canton, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about STA-Colonial Blvd NE Phase 2 Gp 1428
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of pavements reconstruction, replacement of existing sidewalk and curb, and the construction of a shared use path along Colonial Boulevard between Rowland Ave. and Maple Ave. NE. in the boulevard. Lighting, waterlines sanitary and drainage facilities will also be upgraded as prat of this project. There are approximately 72 par r Right of Way Acquisition Services for STA-COLONIAL BLVD NE PHASE 2 GP 1428 for the Canton Engineering Department. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Canton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Road, Government, Automotive, Waste Processing and Treatment |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
