logo

Stabilization and development of the bank of the Bécancour River

Sector: Cement • Location: Quebec, Canada

Source: Infrastructure Canada

Project
Completed

The project involves stabilizing a riprap bank portion of 125 meters and to plant vegetation along the coast and the bank to limit erosion in order to stop the degradation of the land in this area. The project involves the following two steps: Stage 1 - Shoreline Stabilization: • Mobilization and demobilization; deforestation; earthwork; Clean stone 50-250 mm diameter; Corner stone 400-800 mm diam

Project Information FAQ

Project Information

5 Q
The project “Stabilization and development of the bank of the Bécancour River” is an infrastructure initiative in the Cement sector, located in Quebec, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves stabilizing a riprap bank portion of 125 meters and to plant vegetation along the coast and the bank to limit erosion in order to stop the degradation of the land in this area. The project involves the following two steps: Stage 1 - Shoreline Stabilization: • Mobilization and demobilization; deforestation; earthwork; Clean stone 50-250 mm diameter; Corner stone 400-800 mm diameter; corner stone 800 mm diameter; Foundation drain; Topsoil and seeding; Repair of the work site. Step 2 - Shoreline development: • Mature trees; Growing trees; shrubs; Removable gazebos; Removable swings; dock; Stone trail; Concrete bases as well as Signs related to communication activities. It should be noted that the gazebos and swings will be fixed to the ground, but they will have to be removed during the flood waters and in winter.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data