Stabilized Full Depth Reclamation Overlay & Guardrail
Sector: Commercial • Location: Le Center, Minnesota, United States of America
Source: Dodge USA
The approximate major quantities are as follows: Class 1 Aggregate Shouldering 14340 Tons 2360 Plant Mixed Bituminous 23000 Tons Milled Bit. Surface Several Depths 2200 Sq. Yd. Full Depth Reclamation 32493 Sq. Yd. Stabilized Full Depth Reclamation (Cement) 30172 Sq. Yd. Cold Inplace Recycle Bituminous 56768 Sq. Yd. 4 Perf. PE Edge Drain 63464 Lin. Ft. Traffic Barrier Type 31 150 Lin. Ft. Lining Cu
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Manufacturing (Industrial)
- Location
- Le Center, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Stabilized Full Depth Reclamation Overlay & Guardrail
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The approximate major quantities are as follows: Class 1 Aggregate Shouldering 14340 Tons 2360 Plant Mixed Bituminous 23000 Tons Milled Bit. Surface Several Depths 2200 Sq. Yd. Full Depth Reclamation 32493 Sq. Yd. Stabilized Full Depth Reclamation (Cement) 30172 Sq. Yd. Cold Inplace Recycle Bituminous 56768 Sq. Yd. 4 Perf. PE Edge Drain 63464 Lin. Ft. Traffic Barrier Type 31 150 Lin. Ft. Lining Culvert Pipe 92 Lin. Ft. Concrete Curb & Gutter Design B624 273 Lin. Ft. 4 Solid & Broken Line Traf... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Le Center |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Manufacturing (Industrial) |
Article published date | 2024-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
