Stack Storage (Plant City FL)
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Ground Up (commercial storage facility) - New Construction Multi Storage Buildings - 11 buildings - 93,274 sq ft (total all buildings) 6.19 acres -Project will include utilities, VAU, stormwater management area, asphalt drive internal drive, sidewalks, and 9 storage buildings - Project Scope: Div. 2 Site Work package (demo, E&S, grading/excavating, drainage, sanitary water, curbs, sidewalks, aspha
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Warehouse, Consumer Products, Metal, Car parking, Automotive, Road, Raw Materials, Power Transmission, Waste Processing and Treatment, Commercial, Power Generation (CCGT)
- Location
- Plant City, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Stack Storage (Plant City FL)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ground Up (commercial storage facility) - New Construction Multi Storage Buildings - 11 buildings - 93,274 sq ft (total all buildings) 6.19 acres -Project will include utilities, VAU, stormwater management area, asphalt drive internal drive, sidewalks, and 9 storage buildings - Project Scope: Div. 2 Site Work package (demo, E&S, grading/excavating, drainage, sanitary water, curbs, sidewalks, asphalt, site concrete, landscaping, irrigation, signage Div. 4 Masonry Div. 3 Building concrete found... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Plant City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Warehouse, Consumer Products, Metal, Car parking, Automotive, Road, Raw Materials, Power Transmission, Waste Processing and Treatment, Commercial, Power Generation (CCGT) |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
