Stacks Road Full Depth Reclamation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The proposed project is 0.83 miles of Full Depth Reclamation (FDR) of Stacks Road from Feldwood Road to approximately 1,000 feet west of Mallory Road intersection (this generally aligns past the main driveway at 4380 Stacks Road). The project also includes pavement widening, asphalt paving, and striping. A section of Stacks Road (about 300 feet in length) at the bridge over the CSX railroad has re
- Status
- Closed
- Sector
- Bridge, Rail, Commercial, Road, Government
- Location
- Atlanta, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Stacks Road Full Depth Reclamation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project is 0.83 miles of Full Depth Reclamation (FDR) of Stacks Road from Feldwood Road to approximately 1,000 feet west of Mallory Road intersection (this generally aligns past the main driveway at 4380 Stacks Road). The project also includes pavement widening, asphalt paving, and striping. A section of Stacks Road (about 300 feet in length) at the bridge over the CSX railroad has recently remediated repairs to the bridge and will be an exception from this project with improveme... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Atlanta |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Rail, Commercial, Road, Government |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
