Stamp Charge Battery No.12 Battery Proper at IISCO Steel Plant
Sector: Metal • Location: India
Source: India Investment Grid (IIG)
Information Steel Authority of India Limited [SAIL] has come up with Stamp Charge Battery No.12 Battery Proper at IISCO Steel Plant with a ticket size of 2518.39 INR Crores. This project in Manufacturing sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The cold repair of COB-11 is being p
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | notice to proceed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information Steel Authority of India Limited [SAIL] has come up with Stamp Charge Battery No.12 Battery Proper at IISCO Steel Plant with a ticket size of 2518.39 INR Crores. This project in Manufacturing sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The cold repair of COB-11 is being planned from 2027 after completion of 14 years of operation. The period of cold repair will be for 2 years. Since during the period of cold repair, the production from COB-10 alone will not suffice, ISP will have to procure both coke and gas/ alternate fuel may not be practicable on a sustained basis due to considerations of cost and availability. The new Stamp Charge battery, COB-12, along with COB-11, COB-10 will be closed down in 2030-31. The new Stamp Charge battery, COB012, along with COB-11, shall be able to cater to the BF coke requirement up to 3.3 MTPA Hot Metal production envisaged by ISP and shall also meet the gas requirement of the plant. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
