logo
ProjectProposed

STAMP Data Center

Sector: Hydro • Location: Town of Alabama, New York, United States

Source: Investigative Post

Stream Data Centers has proposed a 2.2 million square foot data center at the STAMP industrial park in Genesee County. The facility would require 500 megawatts of electricity, which is 83% of the power available at STAMP, and could power nearly every home in Erie County. The project is expected to create 120 jobs and may receive substantial subsidies including discounted hydropower and tax exempti

Status
Prospective
Sector
Hydro, Data Center, Residential, Manufacturing (Industrial), Power Generation (CCGT)
Location
Town of Alabama, New York, United States of America
Updated
22 Jul 2026
Source
Investigative Post

ConstructChat

Ask ConstructChat about STAMP Data Center

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “STAMP Data Center” is an infrastructure initiative in the Hydro sector, located in Town of Alabama, New York, United States. Taiyo aggregates data on it from Investigative Post.

Participants

Not available for this record.

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Stream Data Centers has proposed a 2.2 million square foot data center at the STAMP industrial park in Genesee County. The facility would require 500 megawatts of electricity, which is 83% of the power available at STAMP, and could power nearly every home in Erie County. The project is expected to create 120 jobs and may receive substantial subsidies including discounted hydropower and tax exemptions. The data center is planned to be leased to a Fortune 50 company.

Original sector

Built Sector

Budget

Location

Country

United States of America (USA)

State

New York

City

Town of Alabama

Source

Source

Investigative Post

URL

More Details

Record type

Project

Sector

Hydro, Data Center, Residential, Manufacturing (Industrial), Power Generation (CCGT)

Article published date

2025-12-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project