Standalone 500 MWh Battery Energy Storage System Projects in Odisha
The owner, status and timeline of this project. A free account opens every field.
Source: ESS News
Six grid-connected standalone battery energy storage system (BESS) projects with a cumulative storage capacity of 500 MWh (125 MW x 4 hours) are planned in Odisha, India. The capacity allocation includes five projects of 20 MW/80 MWh each and one project of 25 MW/100 MWh. GRIDCO will enter into battery energy storage purchase agreements with successful bidders, and the projects are eligible for vi
- Status
- Prospective
- Sector
- Solar, Energy Storage, Power Generation (CCGT), Power Transmission, Government
- Location
- Odisha, India
- Updated
- 22 Jul 2026
- Source
- ESS News
ConstructChat
Ask ConstructChat about Standalone 500 MWh Battery Energy Storage System Projects in Odisha
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Six grid-connected standalone battery energy storage system (BESS) projects with a cumulative storage capacity of 500 MWh (125 MW x 4 hours) are planned in Odisha, India. The capacity allocation includes five projects of 20 MW/80 MWh each and one project of 25 MW/100 MWh. GRIDCO will enter into battery energy storage purchase agreements with successful bidders, and the projects are eligible for viability gap funding through the Power System Development Fund scheme of the Ministry of Power. The selected developers will set up, operate, and maintain the storage systems and interconnect them with the state transmission utility network. |
Original sector | Energy Storage |
Location
Country | India |
State | Odisha |
Source
Source | ESS News |
URL |
More Details
Record type | Project |
Sector | Solar, Energy Storage, Power Generation (CCGT), Power Transmission, Government |
Article published date | 2025-12-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
