logo
ProjectPlanned

Standard Lithium Arkansas Direct Lithium Extraction Project

The owner, status and timeline of this project. A free account opens every field.

Source: Finimize

Standard Lithium and energy partner Equinor released a Definitive Feasibility Study (DFS) for their South West Arkansas site, revealing strong economics and technical viability. The project aims to produce 22,500 tonnes of battery-grade lithium carbonate each year, marking the US's first major commercial Direct Lithium Extraction operation. The study estimates an unlevered pre-tax internal rate of

Status
Prospective
Sector
Energy Storage, Commercial
Location
Arkansas, United States of America
Updated
22 Jul 2026
Source
Finimize

ConstructChat

Ask ConstructChat about Standard Lithium Arkansas Direct Lithium Extraction Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Standard Lithium Arkansas Direct Lithium Extraction Project” is an infrastructure initiative in the Energy Storage sector, located in Arkansas, United States. Taiyo aggregates data on it from Finimize.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Standard Lithium and energy partner Equinor released a Definitive Feasibility Study (DFS) for their South West Arkansas site, revealing strong economics and technical viability. The project aims to produce 22,500 tonnes of battery-grade lithium carbonate each year, marking the US's first major commercial Direct Lithium Extraction operation. The study estimates an unlevered pre-tax internal rate of return of 20.2% for the project's first phase, with a project cost of $1.45 billion. The project is expected to start profitable large-scale lithium production by 2028.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Arkansas

Source

Source

Finimize

URL

More Details

Record type

Project

Sector

Energy Storage, Commercial

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project