Starbucks TI (Craig & Ryder NLV)
Sector: Water Supply and Storage • Location: North Las Vegas, Nevada, United States of America
Source: Dodge
Tenant Improvement of Existing Grey-Shell Ready for Finishes. All MEPs are Stubbed to the Building Pad. Build-Out Entire 2,400 SF Space to Include Finishes, Cabinetry, Ceramic Tile Flooring, Eco-Grip Flooring. Full MEP Build-Out is Included in the RFP. Water Heater is Supplied and Installed by Plumber. Grease Interceptor is Existing and Scope Includes Tie-In's.
- Status
- Closed
- Sector
- Water Supply and Storage, Consumer Products, Raw Materials, Commercial
- Location
- North Las Vegas, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Starbucks TI (Craig & Ryder NLV)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Tenant Improvement of Existing Grey-Shell Ready for Finishes. All MEPs are Stubbed to the Building Pad. Build-Out Entire 2,400 SF Space to Include Finishes, Cabinetry, Ceramic Tile Flooring, Eco-Grip Flooring. Full MEP Build-Out is Included in the RFP. Water Heater is Supplied and Installed by Plumber. Grease Interceptor is Existing and Scope Includes Tie-In's. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | North Las Vegas |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Consumer Products, Raw Materials, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
