logo

Stardust Power Oklahoma Lithium Refinery Phase One

Sector: Energy Storage • Location: Muskogee, Oklahoma, United States

Source: Metal Tech News

Project
Planned

The first phase of the planned Stardust Power lithium refinery in Muskogee, Oklahoma, is designed to produce 25,000 metric tons of battery-grade lithium carbonate annually, enough to supply materials for roughly 500,000 electric vehicles per year. The project has secured the site and key permits, including an air permit, and is positioned to leverage highway, rail, and river barge transport for ef

Status
Prospective
Sector
Energy Storage, Warehouse, Road, Metal, Oil and Gas, Automotive, Electric Vehicles (EVs), Rail, Power Generation (CCGT)
Location
Muskogee, Oklahoma, United States of America
Updated
22 Jul 2026
Source
Metal Tech News

ConstructChat

Ask ConstructChat about Stardust Power Oklahoma Lithium Refinery Phase One

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Stardust Power Oklahoma Lithium Refinery Phase One” is an infrastructure initiative in the Energy Storage sector, located in Muskogee, Oklahoma, United States. Taiyo aggregates data on it from Metal Tech News.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The first phase of the planned Stardust Power lithium refinery in Muskogee, Oklahoma, is designed to produce 25,000 metric tons of battery-grade lithium carbonate annually, enough to supply materials for roughly 500,000 electric vehicles per year. The project has secured the site and key permits, including an air permit, and is positioned to leverage highway, rail, and river barge transport for efficient logistics.

Original sector

Energy Metals

Budget

Location

Country

United States of America (USA)

State

Oklahoma

City

Muskogee

Source

Source

Metal Tech News

URL

More Details

Record type

Project

Sector

Energy Storage, Warehouse, Road, Metal, Oil and Gas, Automotive, Electric Vehicles (EVs), Rail, Power Generation (CCGT)

Article published date

2026-04-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project