logo

Stargate Project Data Center Campuses

Sector: Natural Gas • Location: Memphis, Southaven, West Texas, Virginia (various), Tennessee, Mississippi, Texas, Virginia, United States

Source: Startup Fortune

Project
Under Construction

Eleven data center campuses in the US tied to OpenAI, Meta, Microsoft, and xAI are under construction with natural gas power projects that could emit more than 129 million tons of greenhouse gases annually, exceeding Morocco's entire 2024 emissions. The Stargate Project, led by OpenAI, includes three natural gas projects with a combined potential to emit over 24 million tons annually. xAI's Coloss

Project Information FAQ

Project Information

3 Q
The project “Stargate Project Data Center Campuses” is an infrastructure initiative in the Natural Gas sector, located in Memphis, Southaven, West Texas, Virginia (various), Tennessee, Mississippi, Texas, Virginia, United States. Taiyo aggregates data on it from Startup Fortune.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Eleven data center campuses in the US tied to OpenAI, Meta, Microsoft, and xAI are under construction with natural gas power projects that could emit more than 129 million tons of greenhouse gases annually, exceeding Morocco's entire 2024 emissions. The Stargate Project, led by OpenAI, includes three natural gas projects with a combined potential to emit over 24 million tons annually. xAI's Colossus campuses in Memphis and Southaven could each generate over 6.4 million tons of CO2 equivalents per year. Microsoft is reportedly pursuing a Chevron-backed project in West Texas with a permit for 11.5 million tons of emissions annually. These projects represent a significant entrenchment of fossil fuel power in data center energy supply, reversing grid decarbonization trends.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data