Starlite Court Water Main Reconstruction
Sector: Water Supply and Storage • Location: Juneau, Alaska, United States of America
Source: Dodge
This Project consists of underground utility work including the replacement of the existing 6-inch ductile iron water main and copper services with new 10-inch HDPE water main and poly services, fire hydrant replacement, installation of temporary water systems to maintain service to affected residents; installation of sewer service cleanouts, replacement of existing main line sewer cleanout with n
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Metal, Waste Processing and Treatment, Car parking, Road, Power Transmission, Automotive, Commercial, Power Generation (CCGT), Steel
- Location
- Juneau, Alaska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Starlite Court Water Main Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Project consists of underground utility work including the replacement of the existing 6-inch ductile iron water main and copper services with new 10-inch HDPE water main and poly services, fire hydrant replacement, installation of temporary water systems to maintain service to affected residents; installation of sewer service cleanouts, replacement of existing main line sewer cleanout with new end of line sanitary sewer manhole, and replacement of existing corrugated metal pipe driveway... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alaska |
City | Juneau |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Metal, Waste Processing and Treatment, Car parking, Road, Power Transmission, Automotive, Commercial, Power Generation (CCGT), Steel |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
