logo
ProjectStart

START/Outfall Rehabilitation

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

ATCO Pipelines Crossing East of 127 Street ? Replace (upsize) approximately 28 m of the existing 375 mm triple pipe concrete Outfall sewer (replacement pipes shall be 1,500 mm PVC DR35 or approved alternate). Includes disposal of sludge accumulated in pipe (removal and disposal along with existing pipe, or flush/clean the sludge out of the pipe prior to pipe removal). ? Replace (upsize) approximat

Status
Under Construction
Sector
Commercial, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Government
Location
Fort Saskatchewan, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about START/Outfall Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “START/Outfall Rehabilitation” is an infrastructure initiative in the Commercial sector, located in Fort Saskatchewan, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ATCO Pipelines Crossing East of 127 Street ? Replace (upsize) approximately 28 m of the existing 375 mm triple pipe concrete Outfall sewer (replacement pipes shall be 1,500 mm PVC DR35 or approved alternate). Includes disposal of sludge accumulated in pipe (removal and disposal along with existing pipe, or flush/clean the sludge out of the pipe prior to pipe removal). ? Replace (upsize) approximately 37 m of the existing 1,200 mm x 900 mm concrete box START sewer (replacement pipes shall be 1...

Procurement method

Location

Country

Canada

State

Alberta

City

Fort Saskatchewan

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Government

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project